Showing posts with label Guorui Xiechuang Southern Base. Show all posts
Showing posts with label Guorui Xiechuang Southern Base. Show all posts

Tuesday, June 11, 2024

Fighting in the "summer", Zhaoqing large-scale industrial cluster area sprints to the second quarter of 2024

Fighting in the "summer", Zhaoqing large-scale industrial cluster area sprints to the second quarter of 2024


Invest in Zhaoqing 2024-06-11 21:10 Guangdong, China


Summer is a good time, and it is the right time to build. The second quarter is the "critical season" for the development of the whole year and the "golden season" for project construction.


At present, the construction of various projects in the municipal-managed starting area of ​​Guangdong Province (Zhaoqing) Large Industrial Cluster Area (hereinafter referred to as the municipal-managed starting area of ​​the cluster area) is going all out to promote the project to catch up with the progress, and work hard to rush forward, presenting a scene of construction in full swing.

Zhaoqing large-scale industrial cluster area,zhaoqing,guangdong,china,Tailing Electric Vehicle Industrial Park,Guorui Xiechuang Southern Base,Lianfu Industrial Park,

The construction of the industrial park is accelerating


Recently, I walked into the Lianfu Industrial Park project in the municipal-managed starting area. The workers are working intensively and orderly, and the prototype of the park has basically appeared.


As one of the basic supporting facilities of the large production area, it has built a new space for the integration of industry and city with low prices, centralized and efficient, convenient life, and "ready-to-move-in" through the construction of a smart industrial park to serve the implementation of the project.

Zhaoqing large-scale industrial cluster area,zhaoqing,guangdong,china,Tailing Electric Vehicle Industrial Park,Guorui Xiechuang Southern Base,Lianfu Industrial Park,


At present, the main construction of the first phase of the Lianfu Industrial Park project has been basically completed, and the construction of the outdoor landscape project is being promoted with all efforts. Among them, the four general factory buildings and R&D workshops have completed the five-party main acceptance and have begun to attract investment, focusing on attracting outstanding enterprises in the electronic information industry, new energy vehicles and auto parts industry, high-end equipment manufacturing, advanced materials and other industries to settle in.


The second phase of the first phase has fully broken through the "positive and negative zero", and the general factory buildings, R&D workshops, product exhibition centers, etc. are being accelerated. Among them, the main structures of small and medium-sized factories No. 1, 2, 4, 6, and 7, large factory No. 3, and exhibition center No. 1 have been capped. All buildings in the second section are expected to complete the main structure capping by the end of this year. After the completion of the two sections, more than 90,000 square meters of dormitory space can be provided to solve the accommodation problem of 6,000 people.


Roads are connected, finances are connected, and road network construction is taking shape


Roads are also an important part of infrastructure construction. Three roads, including the second phase of Zhenxing Avenue, Section AB of Beishui Avenue, Fuxi Hengsan Road, and four roads, including Fuxi Zongsi Road, are under construction, such as cement mixing piles, sewage pipe laying, and rainwater culverts. After completion, these roads will improve the road network structure of the municipal starting area and provide convenient travel conditions for enterprises in the park.

Zhaoqing large-scale industrial cluster area,zhaoqing,guangdong,china,Tailing Electric Vehicle Industrial Park,Guorui Xiechuang Southern Base,Lianfu Industrial Park,

Project construction is in full swing. In addition to infrastructure, project construction in the municipal starting area of ​​the agglomeration area has also shown a trend of overall acceleration.


So far, a total of 47 projects have been started in the municipal starting area, of which 9 projects have fully broken through the "positive and negative zero".

Zhaoqing large-scale industrial cluster area,zhaoqing,guangdong,china,Tailing Electric Vehicle Industrial Park,Guorui Xiechuang Southern Base,Lianfu Industrial Park,


These projects include a variety of industries such as new energy vehicles and auto parts, new energy storage, and new materials. Some projects have large investment scales, high technical content, and strong driving effects, such as the Tailing Electric Vehicle Industrial Park project with an investment of 1 billion yuan, the Guorui Xiechuang Southern Base Production General Plant project, and the Tiancheng High-end Automotive Hub project. With the gradual advancement of these projects, the industrial structure of the large production area will be further optimized and upgraded, and the industrial strength will also be significantly improved.


At the project construction site of the municipal starting area, the tower cranes have become a beautiful landscape.


At present, the municipal starting area has formed a spectacular scene of 40 tower cranes operating at the same time. These tower cranes not only show the hot scenes of project construction, but also reflect the determination and confidence of the large production area in promoting high-quality development.


With full strength in the construction of the project, the cluster area will focus on the annual key tasks and target tasks, and strive to promote all work to run out of "acceleration" and achieve "high quality", providing strong support and injecting new impetus for the high-quality development of the large production area.



Sihui City--China's key cities for attracting foreign investment


Investment Promotion Bureau of Sihui City

Address: 3F, Administrative Center, Dongcheng Street, Sihui City, Guangdong Province

Tel:   0086-758-3611228

Fax:  0086-758-3611188

Email: SHQYFW@VIP.163.com


Tuesday, December 12, 2023

Investment of 1 billion, annual output value of 3 billion! This project in the agglomeration area has started--Zhaoqing Guorui Xiechuang Energy Storage Technology Co

Investment of 1 billion, annual output value of 3 billion! This project in the agglomeration area has started


Zhaoqing Large Industrial Cluster Area Guangdong-Guangxi Experimental Zone Published in Guangdong on 2023-12-12 20:23



good news

December 12, 2023

The Guorui Xiechuang Southern Base Production Plant Project has started construction in Zhaoqing's large-scale industrial cluster!

December 12, 2023  The Guorui Xiechuang Southern Base Production Plant Project has started construction in Zhaoqing's large-scale industrial cluster!

Liang Guangting, deputy secretary-general of the Zhaoqing Municipal Government, executive deputy commander-in-chief of the Guangdong Province (Zhaoqing) Large Industrial Cluster Planning and Construction Headquarters, deputy secretary of the Party Working Committee and director of the Management Committee of the Guangdong-Guangxi Special Pilot Zone for Cooperation (Zhaoqing),


Peng Songguang, Director of the Office of the Planning and Construction Headquarters of Large Industrial Agglomeration Areas of Guangdong Province (Zhaoqing), member of the Party Working Committee and Deputy Director of the Management Committee of the Guangdong-Guangxi Cooperation Special Pilot Zone (Zhaoqing),


Tan Yi, General Manager of Zhaoqing Guorui Xiechuang Energy Storage Technology Co., Ltd.


Attend the groundbreaking ceremony.



The total investment is 1 billion yuan and the annual output value is 3 billion yuan.


The Guorui Xiechuang Southern Base Production Plant project has a total investment of 1 billion yuan, a construction period of 10 months, an area of 66 acres, and an annual output value of 3 billion yuan!

The main building is divided into four buildings, including the R&D center, container integration workshop, mold packaging workshop, dormitory building, etc.

Rendering of Guorui Xiechuang Southern Base Production Plant project.

Rendering of Guorui Xiechuang Southern Base Production Plant project.


After the project is completed, various advanced intelligent manufacturing technologies, equipment and materials will be integrated to realize an efficient and intelligent zero-carbon factory for the enterprise.



promote formation "Multi-energy complementary" power supply structure



The energy storage products produced after the project is put into operation include high-tech shared energy storage products, photovoltaic products, etc.

It can effectively and comprehensively cover various functional requirements such as the source network side and user side, and play a positive demonstration role in various factories, parks and other places. It will help improve the regional energy structure and promote the formation of a "multi-energy complementary" power supply in Zhaoqing. structure to improve the operating efficiency of the power system.


“It only took 3 months”



From the signing of the contract to the commencement of construction, it only took us 3 months! The existing high-quality companies in Zhaoqing, such as Xpeng Motors and Tailing Electric Vehicles, are exactly the customers we need. The considerate service provided by the Zhaoqing Municipal Government, especially the Zhaoqing agglomeration area, makes us firmly choose Zhaoqing!


Zhaoqing Guorui Xiechuang Energy Storage Technology Co., Ltd.

General Manager Tan Yi said that the favorable business environment, considerate government services and complete upstream and downstream supply chains are the main reasons for the project to land in Zhaoqing.



Zhaoqing's large-scale industrial agglomeration area adheres to the real economy as its foundation, the manufacturing industry as its core, adheres to the requirements of high-quality development, and regards project construction as a "strong engine" to promote high-quality development.


Next, the agglomeration area will continue to deepen and optimize industrial investment promotion, strengthen project implementation services, and strive to build Zhaoqing’s “first park” and “first platform”!



Sihui City Investment Promotion Center

Contact information


Tel: +86 758 3611228

Fax: +86 758 3611228

Email: shqyfw@vip.163.com

Website: https://www.sihui.gov.cn/gzjg/shszsj/zsjgz/index.html

精选的博文

Moving the factory to Sihui, Zhaoqing --- a conversation between two bosses from Guangdong 搬工廠去肇慶四會----兩個廣東老闆的對話

Moving the factory to Sihui, Zhaoqing --- a conversation between two bosses from Guangdong A: What happened to your factory in Vietnam recen...